Read The Transcript:

Bob: 

SWM PAVE system when designed properly even in the worst soil conditions will still gain infiltration into those soils. Most jurisdictions on average nationwide’s water quality volume requirement is treating the first 1.2 inches. We can infiltrate 1.2 inches even in some of the worst soils within 24-hours. And, depending on what part of the country we are in, we can hold the storm for a longer period of time as well.

Satisfy your stormwater requirements, eliminate runoff, and treat rainwater instantly on your project. Reduce costs by going green.

© 2019 SWM PAVE

Share This